Open Air Theatre

The New Shakespeare Company required several new facilities including a bar / rehearsal area to support an existing studio space and new toilets for the amphitheatre.

The new facilities are conceived as an extension of the romantic landscape of the theatre, magical grottos entered through holes in the existing hedges. Simple materials like softwood, plywood and resin, assembled in a carefully controlled way, are made luminous by hidden lighting, lifting the activities out of the realm of the purely prosaic. The toilets open on to secluded gardens filled with lush, scented plants. The construction was designed to impact lightly on the environment and the toilets are supplied by water from a borehole in Regent’s Park, reducing the reliance on mains supply.

Construction was completed in 7 months to ensure no interruption to the summer season. Fairy lights twinkle in the hedges, an ethereal setting for A Mid-Summer Night’s Dream.

Projecy Team
Graham Bizley

Structural Engineer
Price & Myers

Landscape Consultant
Colvin & Moggridge

Awards:
Turning to Timber Award — Winner, Builder & Engineer Awards 2009

Civic Trust Awards 2009 — Shortlisted

Commercial and Public Access — Runner-up, The Wood Awards 2009

Best Use of Panel Products — Runner-up, The Wood Awards 2009

Press:
RIBA Journal – August 2008, Naomi Stungo, ‘Bottom, thou art translated’

Architecture In Detail vol II – 2010, Graham Bizley, Architectural Press

Regents Park Open Air Theatre Plan – Prewett Bizley